Download Project Details

Choose your preferred format:

Our Engineering Projects

Showcasing our expertise through a diverse portfolio of completed and ongoing projects across all divisions.

0

Civil Projects

0

M&E Projects

0

IT Solutions

0

Agriculture Projects

0

Financial Advisory

Showing 0 of 0 projects
Maintenance and Repair of Air Conditioners at TBH
M&E
Ongoing

Maintenance and Repair of Air Conditioners at TBH

HVAC

Start: Mar 2026 | Est. Completion: Mar 2027

Maintenance and Repair of Air Conditioners at TBH

MEP & Maintenance Division Division

This project is currently in progress, focusing on delivering engineering and maintenance services in line with client requirements and industry standards. Activities are being carried out systematically to ensure quality, safety, and efficiency. The team is actively working to meet project milestones within the scheduled timeline while maintaining high performance standards.

Thellipalai,Jaffna
Thellipalai Base Hospital
Zero-Waste Coconut Processing & Export Industry
M&E
Ongoing

Zero-Waste Coconut Processing & Export Industry

Export Industry

Start: Jan 2026 | Est. Completion: Aug 2027

Zero-Waste Coconut Processing & Export Industry

MEP & Maintenance Division Division

This proposal presents the establishment of a Zero-Waste Coconut Processing & Export Industry in the Northern Province of Sri Lanka. The project focuses on producing high-value coconut-based products exclusively for export while ensuring complete utilization of coconut by-products.

Poonakai-Kilinochchi
Northern Developments Ltd.
Apartment Building – Modara
Civil
Upcoming

Apartment Building – Modara

Twelve-Storey Apartment Building – Modara

Start: Aug 2026

Apartment Building – Modara

Construction & Civil Division Division

A state-of-the-art 12-story commercial complex featuring premium office spaces, retail outlets, food courts, and underground parking facilities. The project incorporates sustainable design principles with energy-efficient systems and smart building technology.

modara-Colombo
Northern Developments Ltd.
Maintenance and Repair of Air Conditioners at DHV
M&E
Upcoming

Maintenance and Repair of Air Conditioners at DHV

Hospital Maintenance

Start: 2026

Maintenance and Repair of Air Conditioners at DHV

MEP & Maintenance Division Division

Our team will successfully carry out preventive and corrective air conditioning maintenance at Vavuniya District General Hospital, one of the key healthcare institutions in the Northern Province. The hospital serves a large number of patients and operates critical medical facilities that require reliable temperature control and indoor air quality. The hospital has approximately 700 beds and offers a wide range of medical services.

Vavuniya
District Hospital Vavuniya
NEC COCO
Agriculture
Upcoming

NEC COCO

Coconut Farming

Start: 2026

NEC COCO

Agriculture & Agro-Solution Division Division

The Coconut Farming Project focuses on the sustainable cultivation, management, and production of coconuts to support agricultural development, economic growth, and environmental sustainability. The project aims to maximize plantation productivity through modern farming techniques, efficient resource management, and best agricultural practices. By implementing proper cultivation methods, the project contributes to increased yields, improved farmer livelihoods, and long-term plantation sustainability.

Kilinochchi-Poonakari,Mudkompan
Northern Engineering consortium (pvt)Ltd
Maintenance System – Customer & Service Provider App
IT
Ongoing

Maintenance System – Customer & Service Provider App

digital platform

Start: Oct 2025 | Est. Completion: Jan 2026

Maintenance System – Customer & Service Provider App

Information Technology (IT) Division

The Maintenance System App is a digital platform that connects customers and service providers for efficient management of maintenance, repairs, and service requests. The system improves response time, transparency, and service quality through real-time communication and tracking.

Multiple Locations (Cloud-based)
servicely.lk
Rooftop Solar Panel Installation
Division
Ongoing

Rooftop Solar Panel Installation

Rooftop Solar Panel Installation

Start: Jan 2024 | Est. Completion: Dec 2026

Rooftop Solar Panel Installation

Energy, Utilities & Sustainable Solutions Division

The Rooftop Solar Panel Installation project focuses on the design, supply, installation, testing, and commissioning of grid-connected rooftop solar photovoltaic (PV) systems to promote renewable energy adoption, cost savings, and environmental sustainability for residential, commercial, and industrial buildings.

All over Sri Lanka
Northern Developments Ltd.
CONSTRUCTION OF KALMADU RURAL WATER SUPPLY SCHEME IN (  KILLINOCHCHI DISTRICT)
Civil
Completed

CONSTRUCTION OF KALMADU RURAL WATER SUPPLY SCHEME IN ( KILLINOCHCHI DISTRICT)

WATER SUPPLY SCHEME IN ( KILLINOCHCHI DISTRICT)

Completed: Dec 2021

CONSTRUCTION OF KALMADU RURAL WATER SUPPLY SCHEME IN ( KILLINOCHCHI DISTRICT)

Construction & Civil Division Division

Rural Water Supply Scheme was implemented in 2019 under an Asian Development Bank (ADB) funded program to improve access to safe, reliable, and sustainable drinking water for rural communities in the Iyakkachchi area. The project focused on strengthening rural water infrastructure and enhancing public health and living standards.

Kilinochchi-kalmadunagar
Asian Development Bank
Construction of Iyakkachchi Rural Water Supply Scheme
Civil
Completed

Construction of Iyakkachchi Rural Water Supply Scheme

Water Supply Scheme

Completed: Dec 2021

Construction of Iyakkachchi Rural Water Supply Scheme

Construction & Civil Division Division

The Iyakkachchi Rural Water Supply Scheme was implemented in 2019 under an Asian Development Bank (ADB) funded program to improve access to safe, reliable, and sustainable drinking water for rural communities in the Iyakkachchi area. The project focused on strengthening rural water infrastructure and enhancing public health and living standards.

Iyakkachchi
Asian Development Bank
SYSTEM REHABILITATION FOR NRW REDUCTION IN SOUTH PART OF COLOMBO CITY PACKAGE – 04
Civil
Completed

SYSTEM REHABILITATION FOR NRW REDUCTION IN SOUTH PART OF COLOMBO CITY PACKAGE – 04

SYSTEM REHABILITATION FOR NRW REDUCTION IN

Completed: Jul 2025

SYSTEM REHABILITATION FOR NRW REDUCTION IN SOUTH PART OF COLOMBO CITY PACKAGE – 04

Construction & Civil Division Division

The System Rehabilitation for Non-Revenue Water (NRW) Reduction Project – South Part of Colombo City (Package 04) was implemented to reduce water losses, improve network efficiency, and enhance service reliability within the urban water distribution system. The project focused on rehabilitating aging infrastructure, improving monitoring and control, and strengthening operational performance.

Colombo
Asian Development Bank